Engr. FLORENTINO J. DESTACAMENTO, CE
Municipal Engineer / concurrent Building Official
- Office Address: 2nd Floor, Multi-Purpose Building – Municipal Hall Compound
- Email Address: alaminosmunicipalengineering@gmail.com
- Tel. No.: (049) 521-0300
PLANNING AND CONSTRUCTION DIVISION
- Integrated Solar Streetlights
- Along Alaminos-Lipa/CALABARZON Road (on-going)
- Along Alaminos-San Pablo By-pass Road Phase 1 (completed)
- Along Barangay Road at San Gregorio (completed)
- Along Maharlika Highway at Barangay San Agustin (on-going)
- Barangay San Juan & San Andres (completed)
- Expansion of Multi-purpose Building (2nd Floor) at Barangay Poblacion 2 (on-going)
- Construction of Health Station & Evacuation Facility at Barangay San Roque (on-going)
- Construction of Evacuation Facility Phase 2 at Barangay Palma (on-going)
- Construction of Slope Protection (RIPRAP) at Barangay Poblacion 4 (completed)
- Supply and Installation of Elevated Water Tank (3000gals) & Other Related Works at Barangay San Miguel (completed)
- Repair & Improvement of Façade Perimeter Fence of Alaminos Elementary School (on-going)
- ADM-2017
- Construction of Evacuation Facility – Phase 1 at Barangay Palma (completed)
- Construction of Local Access Road at Barangay San Juan (completed)
- Construction of Local Access Road at Kalye onse, Barangay Palma (completed)
- Construction of Local Access Road – Phase 1 at Barangay San Ildefonso (completed)
- AM-2018
- Construction of Local Access Road – Phase 2 at Barangay San Ildefonso (completed)
- Construction of Reinforced Concrete Box Culvert at PNR, Barangay San Juan (completed)
- AM-2019
- Construction of Local Access Road at Marina Mines, Barangay San Juan (on-going)
CONSTRUCTION PERMIT DIVISION (ONE-STOP SHOP)
- CITIZEN CHARTER
- Guidelines, Policies, Laws, Order, etc.
- National Building Code of the Philippines
- Memorandum / Circular
- DPWH-NCBO MC 01, s2018 (Strict Compliance on Setback Requirements under Rule VIII, Revised IRR of PD 1096)
- DILG Memo 03-05-2019 (Revocation / Cancellation of Mayor’s / Business Permit of Establishment Found to be Violating Environmental Laws, National Building Code, Fire Code, Code of Sanitation, and Other Related Laws & Policies
- DILG, DPWH, DICT, DTI Joint MC#2018-01 (Guidelines in Streamlining the Processes for the Issuance of Building Permits and Certificate of Occupancy)
- Schedule of Fees
- Guidelines, Policies, Laws, Order, etc.
DOWNLOADABLE FORMS
- Unified Application Form for Building Permit
- Building Permit
- Architectural Permit
- Civil and Structural Permit
- Electrical Permit
- Certificate of Final Electrical Inspection-Completion Form
- Sanitary/Plumbing Permit
- Mechanical Permit
- Electronics Permit
- Fencing Permit Form
- Demolition Permit
- Excavation and Ground Preparation Permit
- Scaffolding Permit
- Repair Permit
- Temporary Sidewalk Permit
- Raising Permit
- Interior Design Permit
- Moving Permit
- Certificate of Completion
- Unified Documentary Requirements for Permits
National Building Code of the Philippines & its IRR (PD1096)
- NBC_FEES_AND_CHARGES
- Compliance Evaluation Sheets for Building Permit
- Compliance Evaluation Sheet for Certificate of Occupancy and Inspection Report
- Documentary Requirements for Building Permit Application
- Documentary Requirements for Occupancy Permit Application
- Exemption from Building Permits